1. Project type
2. Who's building it
3. Additional complexity

Estimated range, not a quote

 

Both ends can move. A leaner scope or lower-cost market can land below the interval, while unusual complexity or a more expensive delivery model can push it higher. The factors below are weighted differently because an API integration, custom design work, and content migration do not have the same effect on every kind of project.

 

 

    Use this to sanity-check a quote, not to demand one. The real number depends on detailed scope, content readiness, technical constraints, geography, and delivery model, none of which a short estimator can fully capture.

    Get this range in your inbox

    Send me your actual scope and I'll tell you what I think it really requires, including if that turns out to be less than this estimate.

    Your message goes directly to my inbox. I use it only to understand the project and reply with a useful next step.